- Insulation: Insulate walls and ceiling.
- Drywall: Install drywall panels.
- Exterior: Install the exterior siding, windows, and doors.
Phase 6: Internal And External Work (Weeks 16-20)
- Documentation: Complete all closing documents.
Phase 9: Closing (Week 26-28)
- Land Clearing: Remove trees, stumps, and other obstacles from the construction site.
- Grading: Level the ground for construction.
- Foundation Layout: Mark the boundaries for the foundation.
Phase 2: Site Preparation (Weeks 4-6)
- Flooring: Lay down flooring material.
- Painting: Paint interior and exterior.
- Fixtures: Install light fixtures, faucets, and other finishes.
Phase 7: Finishes (Weeks 20-24)
- Wall Framing: Erect the wooden frame for the walls.
- Roof Framing: Build the roof structure.
- Sheathing: Install the sheathing on the walls and roof.
Phase 4: Framing And Structure (Weeks 8-12)
- Landscaping: Complete any necessary landscaping.
- Final Inspection: Have the building inspected to ensure it meets all codes and standards.
- Walk-Through: Conduct a final walk-through with the buyer or real estate agent.
Phase 8: Final Touches (Weeks 24-26)
- Plumbing: Install internal plumbing lines.
- Electrical: Install electrical systems.
- HVAC: Install heating, ventilation, and air conditioning systems.
Phase 5: Utilities And Systems (Weeks 12-16)
- Land Acquisition: Procure the land where the new house will be built.
- Initial Planning and Design: Work with architects and engineers to create initial sketches, blueprints, and floor plans.
- Permitting: Apply for and secure all necessary building permits from local authorities.
- Budgeting and Financing: Finalize the budget and secure financing.
Phase 1: Pre-Construction (Weeks 1-4)
- Excavation: Dig trenches or a hole for the foundation.
- Footings and Foundation: Pour concrete footings and lay the foundation.
Phase 3: Foundation Work (Weeks 6-8)